There is movement at the station as the build train approaches. The end is near. Maybe not tomorrow or the next day, but it is definately near.
A lot of internal vinework today, and placing the rest of the elements into the building and tying them into the structure.
The cross beam is in place with the internal light, and the tree has been mounted.
OMG, this is getting exciting as the end is finally in sight.
Next up will be putting the exterior LED wiring in place, roof and front wall to be put in place, exterior vine work on the structure, hiding the platform under the tree that raised it to the correct height, vine work to link the tree to the building and putting the exterior elements in place. Thats still a lot, but irt should go quick as long as I get the LED wiring right.
Todays update photo is courtesy of Chatgpt learning how to draw.
The end really is in sight now! All that internal vinework, the tree, and the lighting are making the whole build feel so close to the final reveal. There’s still a lot to do, but I’m excited to see how it all looks once the exterior lights and finishing details are in place!
I think there is a possibility that it will be finished in the next week, with the exception of 1 LED that likely wonty be delivered until mid October and any exterior works needed to hide thart one LED’s wiring.